74 Cyprus Energy Regulatory Authority Renewable Energy Sources (RES) Wind Farms: The installed capacity of wind farms for commercial purposes did not change in the year 2021, it remains at 157.5MWe, as in 2020. Photovoltaic Systems: In 2021, 4 applications were submitted for the granting of a license to construct photovoltaic power plants for commercial purposes with a total capacity of 28MWe and 10 construction licenses were granted for the construction of photovoltaic power plants for commercial purposes with a total capacity of 76MWe. The installed capacity of photovoltaic systems for commercial purposes did not change in the year 2021, it remains at 8MWe, as in 2020. The following Figures 8, 9, 10 and 11 show statistical data on licenses for the construction and operation of power production plants for commercial purposes that were granted by CERA from conventional units and RES units for the period 2004 to 2021. Figure 7 - Descriptive presentation and geographical distribution of installed conventional plants for commercial use until 2021 PAFOS LEMESOS LARNAKA AMMOCHOSTOS LEFKOSIA KERYNEIA 0 8.000 16.000 32.000 48.000 64.000 Meters Date 01/02/2022 Scale 1:400.000 POWER STATIONS Legend 3 Power Stations of Total Capacity 1478 MW License for the construction and operation of power production plants for commercial use Conventional Units In 2021, 1 application was submitted for the granting of a license to construct a power production plant with conventional fuel for commercial purposes with a total capacity of 284,004MWe. The installed capacity of conventional power plants for commercial purposes did not change in the year 2021, it remains at 1478MWe, as in 2020. The geographical distribution of the power plants for commercial use is presented in Figure 7. MONI POWER STATION 150 MW VASILIKOS POWER STATION 868 MW DHEKELIA POWER STATION 460 MW
RkJQdWJsaXNoZXIy MzU4MTg0