Cyprus Energy Regulatory Authority Annual Report 2021

39 Annual Report 2021 Decision 334/2021 - Approval of Proposed Amendments to the Trading and Settlement Rules by the Transmission System Operator - Cyprus - Version 2.0.3 By Decision 334/2021, CERA approved the proposed Trading and Settlement Rules, Version 2.0.3 that were submitted by the TSOC. Decision 365/2021 - Fuel Clause Coefficients for the Adjustment of the Wholesale Tariff (T-W), Fuel Clause Coefficients and Basic Tariffs for the purchase of RES-generated energy for the period January - June 2022 By Decision 365/2021, CERA approved the Fuel Clause Coefficients and Basic Prices for the adjustment of the wholesale tariff (T-W) and for the purchase of energy from RES as well as the Basic Purchase Price of RES-generated energy for the period January-June 2022, as presented below. Table 4 - Fuel Clause Coefficients and Basic Purchase Prices of RES-generated energy Fuel Clause Coefficients for the adjustment of the wholesale tariff (T-W) €c/kWh/ 1 €c Low voltage 0.00022483 Medium voltage 0.00022212 High voltage 0.00021977 Fuel Clause Coefficients for the purchase of RES-generated energy €c/kWh/ 1 €c Low voltage 0.00022212 Medium voltage 0.00021977 High voltage 0.00021682 Basic prices for the purchase of RES-generated electricity €c/kWh Low voltage 6.960 Medium voltage 6.890 High voltage 6.801 Decision 373/2021 - Forms and Standard Terms of Exemption from holding a license By Decision 373/2021, for the purposes of compliance with the Electricity Law, CERA approved the updated format of the Forms and Standard Terms of Exemption to holding a license for the Construction and operation of power plants using RES with generation capacity of up to 5MW greater than 50kW up to 8MW and the construction and operation of power plants with conventional fuels greater than 30kW up to 1MW, up to 1MW for own use or for reserve purposes. Decision 374/2021 - Approval of Transitory Regulation Guarantee Coverage Parameters of the Electricity Market, Version 1.7 for 2022 By Decision 374/2021, CERA approved the specific Transitory Regulation Guarantee Coverage Parameters of the Electricity Market for the period from 1 October 2021 to 30 September 2022. Decision 375/2021 - Approval of Transitory Regulation Parameters of the Electricity Market Version 1.7 for 2022 By Decision 375/2021, CERA approved the specific Transitory Regulation Parameters of the Electricity Market for the monthly transmission loss coefficients and the monthly load factors of the production units in the Cypriot System.

RkJQdWJsaXNoZXIy MzU4MTg0